37
Storage Procedure:
•
Step 1: Flush the system twice.
Push the “Auto Flush” button
on the MPC-3000 dis-
play, when the first flush has been completed,
press “Stop”
to cancel the 5 day interval
timer, then
press “Auto Flush” again
.
•
Step 2:
Remove the quick disconnect fitting
from the brine discharge outlet of the
Clark pump, and
replace with the quick disconnect hose
from your service kit,
and lead the hose to a 5 gallon bucket.
•
Step 3:
Set the switches to “Run Auto” and “Flush Manual”
to fill the bucket with
2 gallons of fresh unchlorinated water. When the bucket has reached the desired level
Set
both switches to “Auto”
•
Step 4:
Connect the hose
, using the garden hose barb fitting from your service kit,
to
the service port
of the fresh water flush module. Lead the hose into the bucket.
Turn
the service valve
on the fresh water flush module 180°, so the intake is now coming
from the bucket.
•
Step 5:
Mix the storage chemical
compound into the water in the bucket.
•
Step 6:
Make sure the pressure relief valve on the Clark pump is Open
(unpressurized).
•
Step 7:
Set the switches on the pump module to
“Service System” and “Flush Auto”
to turn on the feed
pump. Circulate the storage chemical in the system for approxi-
mately 10 minutes.
Set both switches to Auto
when fin-
ished.
Clean Up:
•
Remove the quick disconnect from the Clark pump brine discharge, and
replace the
original hose that leads to the thru-hull
. You may at this point, if you choose to,
pump the bucket dry by using the feed pump switch. Stop when the bucket is empty.
•
Turn the service valve 180°
back to its original position, and remove the service hose.
•
Turn off the power to the system and the MPC control.
•
LEAVE THE PRESSURE RELIEF VALVE OPEN
Summary of Contents for Newport 1000
Page 2: ...2...
Page 4: ...4...
Page 6: ...6...
Page 8: ...8...
Page 38: ...38 Push the Auto Flush button press Stop press Auto Flush again...
Page 59: ...59 Z BRANE OPERATION MANUAL...