Chapter 7: Replacement Procedures 57
12. Set the Control Panel Subassembly in place and replace the two screws inside
the battery compartment (Figure 7.17). Torque the screws to 7.1 in./lb. (0.8
newton meter).
Figure 7.17
Replacing the Control Panel
13. Place the battery in the battery compartment.
14. Turn on the system.
15. Perform the trackball tests in
to
verify proper operation of the new trackball.
7.4
Main PCBA Subassembly Replacement
7.4.1
Required Parts
•
Service Assembly, PCB C1.9 Main, English (P02075), or
•
Service Assembly, PCB C1.9 Main, French (P02076), or
•
Service Assembly, PCB C1.9 Main, German (P02077), or
•
Service Assembly, PCB C1.9 Main, Italian (P02078), or
•
Service Assembly, PCB C1.9 Main, Portuguese (P02079), or
•
Service Assembly, PCB C1.9 Main, Spanish (P02080)
•
Service Assembly, PCB C1.9 Main, Japanese (P02546)
Screws (2)
Battery
compartment
Summary of Contents for C1.9 PLUS
Page 1: ...C1 9 PLUS Ultrasound System Service Manual...
Page 4: ...iv C1 9 PLUS Ultrasound System Service Manual...
Page 12: ...4 C1 9 PLUS Ultrasound System Service Manual This page intentionally left blank...
Page 18: ...10 C1 9 PLUS Ultrasound System Service Manual This page intentionally left blank...
Page 38: ...30 C1 9 PLUS Ultrasound System Service Manual This page intentionally left blank...
Page 50: ...42 C1 9 PLUS Ultrasound System Service Manual This page intentionally left blank...
Page 72: ...64 C1 9 PLUS Ultrasound System Service Manual This page intentionally left blank...
Page 88: ...80 C1 9 PLUS Ultrasound System Service Manual A 8 Accessory Cables 1 2 3 4 5 6 8 9 10 7 11...
Page 92: ...84 C1 9 PLUS Ultrasound System Service Manual...
Page 98: ...90 C1 9 PLUS Ultrasound System Service Manual...