
6
Electrical connection
6.7.9 Attaching the fuse plugs
Prerequisite:
►
All DC lines and BMS
communication lines are correctly
connected to the battery modules.
Attach the fuse plugs on all battery
modules.
Figure 41: Attaching the fuse plugs
6.7.10 Entering the battery capacity/nominal power on the type
plate
Tools:
•
Permanent marker
►
Mark off the correct battery capacity and nominal power on the type plate of
the storage system.
The type plate is located on the outside of the storage system. The battery capacity
and nominal power can be determined from the technical data (see page 14).
6.8 Subsequent battery add-on
Damage to battery modules through high compensation currents!
When the storage system is switched on, diering voltages of the battery modules
can lead to high compensation currents.
►
Charge the storage system to 85% before installing newbattery modules.
►
Measure and note the voltages of the individual battery modules before
installation.
►
Only install battery modules if the maximum deviation between measured
voltages is less than 1 V.
New battery modules come with 85% charge. This is why older battery modules
must also be charged to this level before installing new ones.
Page 62 of 115
KD-262 | Part-No 52199 | EN | Version 1.00
CAUTION
DANGER
WARNING
Notice
Summary of Contents for sonnenBatterie eco 7.0 Series
Page 7: ...Contents 17 Commissioning report 115 KD 262 Part No 52199 EN Version 1 00 Page 7 of 115...
Page 112: ...16 EU Declaration of Conformity Page 112 of 115 KD 262 Part No 52199 EN Version 1 00...
Page 113: ...EU Declaration of Conformity 16 KD 262 Part No 52199 EN Version 1 00 Page 113 of 115...
Page 114: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried t 49 0 8304 92933 444 o info sonnenbatterie de...