
5
Assembly
5.5.8 Attaching edge guard
Attach the supplied edge guard in the opening between the main and add-on
cabinets. This prevents damage to the leads.
Tools needed
O Spanner A/F 10
Figure 13: open cover
►
Open cover.
Figure 14: edge guard
►
Attach edge guard.
Page 30 of 115
KD-262 | Part-No 52199 | EN | Version 1.00
Summary of Contents for sonnenBatterie eco 7.0 Series
Page 7: ...Contents 17 Commissioning report 115 KD 262 Part No 52199 EN Version 1 00 Page 7 of 115...
Page 112: ...16 EU Declaration of Conformity Page 112 of 115 KD 262 Part No 52199 EN Version 1 00...
Page 113: ...EU Declaration of Conformity 16 KD 262 Part No 52199 EN Version 1 00 Page 113 of 115...
Page 114: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried t 49 0 8304 92933 444 o info sonnenbatterie de...