Electrical connection
6
6.7.7 Connecting the BMS communication line
KLICK!
Connect the BMS communication lines
as described in section 15.5 (pg. 109).
You must hear them click in.
If a BMS communication lead has to be
pulled out:
►
Press the nose on the connector.
►
Then take out the lead.
Connecting to Combox
KLICK!
►
Connect the BMS communication lead to the Combox as illustrated above.
In the case of storage systems without an add-on cabinet:
►
Use a short BMS communication lead, delivered with the battery modules.
In the case of storage systems with an add-on cabinet:
►
Use a long BMS communication lead, delivered with the add-on cabinet.
6.7.8 Check wiring
►
Check screwed DC connections.
►
Make sure the wiring is correct by referring to the overview plans (sections 15.4
and15.5).
KD-262 | Part-No 52199 | EN | Version 1.00
Page 61 of 115
Summary of Contents for sonnenBatterie eco 7.0 Series
Page 7: ...Contents 17 Commissioning report 115 KD 262 Part No 52199 EN Version 1 00 Page 7 of 115...
Page 112: ...16 EU Declaration of Conformity Page 112 of 115 KD 262 Part No 52199 EN Version 1 00...
Page 113: ...EU Declaration of Conformity 16 KD 262 Part No 52199 EN Version 1 00 Page 113 of 115...
Page 114: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried t 49 0 8304 92933 444 o info sonnenbatterie de...