
6
Electrical connection
6.2 Routing cables into storage system
Figure 23: Routing into storage system
1
Group cable (for extra connections of storage system)
2
Ethernet cable
3
Modbus cable
4
Electrical cable
5
Cable to battery emergency stop switch
►
Route the cables into the storage system as illustrated above.
►
Make sure that all screwed cable glands are tightened and optimally seal the
storage system.
Figure 24: Fitting stopper
If cable glands are not in use:
►
Seal them with the fitting stoppers.
Page 38 of 115
KD-262 | Part-No 52199 | EN | Version 1.00
4
3
1
5
2
10924
Summary of Contents for sonnenBatterie eco 7.0 Series
Page 7: ...Contents 17 Commissioning report 115 KD 262 Part No 52199 EN Version 1 00 Page 7 of 115...
Page 112: ...16 EU Declaration of Conformity Page 112 of 115 KD 262 Part No 52199 EN Version 1 00...
Page 113: ...EU Declaration of Conformity 16 KD 262 Part No 52199 EN Version 1 00 Page 113 of 115...
Page 114: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried t 49 0 8304 92933 444 o info sonnenbatterie de...