35
Figure 42 – Removal of the K500 top cover
b) Place the upper front as shown in Figure 43, positioning the flaps of the front part
on the inner face of the structure.
Figure 43 – Fitting the front of the equipment
c) Screw the front onto the frame using the two screws
(A)
that are in the kit (do not
screw the front onto the frame until the end, as it may be necessary to make a small
adjustment to the cover, see point "j").
1
2
Summary of Contents for Everest
Page 138: ...133 ...
Page 139: ...134 ...
Page 140: ...135 ...
Page 141: ...136 26 Maintenance Guide Label ...
Page 142: ...137 Figure 126 Maintenance guide label 27 Electrical Diagram of the Free Standing Fire Unit ...
Page 154: ...149 Flow chart Nevada Flow chart 1 Lighting ...
Page 155: ...150 ...
Page 156: ...151 Flow chart 2 Disabling ...
Page 157: ...152 Flow chart Everest Flow chart 1 Lighting ...
Page 158: ...153 ...
Page 159: ...154 Flow chart 2 Disabling ...
Page 160: ...155 Flow chart Everest Round Flow chart 1 Lighting ...
Page 161: ...156 ...
Page 162: ...157 Flow chart 2 Disabling ...