Subject to changes | © 2020 SOLARWATT GmbH | AZ-TM-PME-1755 | Rev 000.2 | Version: 08/2020
Page 13
MyReserve Pack battery module layout
1
Fastening holes protective cover
(M6x25 screws supplied)
2
Optional fi xation hole for rubber seals of
MyReserve Command 20.2 battery cable
3
Fixation hole for rubber seals of MyReserve
Command 25 battery cable
(M6x20 screws included)
4
Grounding / Earth connection
5
Connection socket for battery cable
(covered when supplied)
6
Mounting lugs
1
1
1
1
3
4
5
6
2
AC Sensor Flex layout
1
Connection terminal for external CT-
clamps
6
DIP-switch S4
Current ratio settings
2
DIP-switches S1, S2, S3 for activation
of CT-clamp measurement
7
Reset switch
3
CAN connection MyReserve (RJ45)
4
Grid-side connections
5
House-side connections