Subject to changes | © 2020 SOLARWATT GmbH | AZ-TM-PME-1755 | Rev 000.2 | Version: 08/2020
Page 22
PE cable installation
1
2
3
4
1
Serrated lock washer
2
Washer
3
PE cable lug
4
Grounding screw
•
loosen the grounding screw from MyReserve Com-
mand and battery modules
•
mount the PE cable protection as shown in the illus-
tration
•
ensure good connection to the main building earth
Ensure earthing continuity!
DANGER
Life threatening danger if the grounding / earthing
is not connected correctly or earth continuity is not
proven!