Subject to changes | © 2020 SOLARWATT GmbH | AZ-TM-PME-1755 | Rev 000.2 | Version: 08/2020
Page 46
Monitoring via
network integration with the
EnergyManager
For integration of the MyReserve into the EnergyManager, please follow the EnergyManager instructions or refer to
the installation instructions for the EnergyManager in the download area of our website www.solarwatt.com.
NOTE
You can fi nd a wiring diagram for the electrical connection in the appendix: Circuit diagram MyReserve with
EnergyManager.
NOTE
NOTE
NOTE
Warranty activation
UK:
In order to activate the product warranty for the
MyReserve, go to the Expert Portal (Pro)/Customer Man-
agement/Activate MyReserve/Activate FullCoverage and
guarantee at www.solarwatt.com.
AUS:
In order to activate the product warranty for the
MyReserve, go to Professionals/Tools/Warranty Activa-
tion at www.solarwatt.com.au.
Please enter all the required customer information for
warranty activation.
Cleaning / maintenance & care
Cleaning
IMPORTANT
Damage to the data plate of the MyReserve with use of unsuitable cleaners.
Do not clean the MyReserve with alcohol or other chemical cleaners. Only use a clean damp rag with a mild
detergent or similar to clean the device.
Maintenance work on the overall system
MyReserve is maintenance-free. The following must be
observed for the inspection and maintenance of a PV sys-
tem in combination with a MyReserve:
•
Only inspect/maintain the PV system with the AC voltage
supply to the MyReserve switched off .
•
Only conduct tests with a test voltage that is below the
maximum permissible operating voltage of the MyRe-
serve: Test voltage ≤ 1.000 V (max. 25A)