PSS-G/RAID Alternative Energy System Deployment Guide
August 2020
|
Solar Stik
®
Inc.
42
|
PRO-Verter
7000 AGS (side view)
Power Hub 2400 (side view)
Power Hub 2400 (side view)
The photos below show how all of the components will look when they are arranged as in the
configuration described in the diagrams in Step 2.
Connect all seven (7) Expander Paks to the two (2) Inter-Connect Strips using seven (7) 5’ Inter-
Connect Cables. Place/stow the Inter-Connect Strips on the second level as shown in the diagram
below. This location protects the Inter-Connect Strips from the environment.
3 Connect Expander Paks to Inter-Connect Strips
Figure 22. Connect Expander Paks using Inter-Connect Strips and leashes and stow the Inter-Connect Strips
Inter-Connect Strip
Inter-Connect Strip
Li Expander Pak 2400 (x4)
Li Expander Pak 2400 (x3)