![Solar Stik PSS-G Deployment Manual Download Page 57](http://html1.mh-extra.com/html/solar-stik/pss-g/pss-g_deployment-manual_1313508057.webp)
|
57
August 2020
|
Solar Stik
®
Inc.
PSS-G/RAID Alternative Energy System Deployment Guide
16 Activate AES
a. Remove the cotter pins and
turn on all Expander Pak master
breaker switches.
Figure 54. Li Expander Pak 2400 power switch activation
Figure 55. PRO-Verter
7000 AGS audible alarm switch
d. Toggle on the PRO-Verter 7000 AGS power switch.
b. If an RMK is not already installed on the
PRO-Verter, use an RJ11 crossover cable
to connect the Remote and Inverter ports
on the upper right-hand corner of the
PRO-Verter 7000 AGS Faceplate.
c. Toggle on the audible alarm switch for the AGS.
Figure 56. PRO-Verter Power switch
Note:
This cable MUST BE a crossover
RJ11 cable. A straight RJ11 cord will not
work.
NOTICE
For the System to function properly, the PRO-Verter must be connected to a minimum of five (5)
Li Expander Paks 2400s.