PSS-G/RAID Alternative Energy System Deployment Guide
August 2020
|
Solar Stik
®
Inc.
56
|
15 Connect the PSS-G/RAID Tower to PRO-Verter
7000 AGS
Figure 53. Power connections from the PRO-Verter 7000 AGS to the PSS-G/RAID Tower
PSS-G/RAID Tower
W116*
PRO-Verter 7000 AGS
*Cable not provided
by Solar Stik