NETYS RT 5 - 7 - 9 - 11 kVA - 551570A - SOCOMEC
78
EN
NRT3-OP-PMB
(Figure 10-13)
N
(L2)
OUT
PUT
AC IN
PUT
N
(L2)
L
(L1)
L
(L1)
DRY
CON
TACT
P2
P3
P4
RS-4
85
P1
REPO
TMO
V
RS
REPO
TMO
V
SMART
SL
O
T
PAR
ALLE
L
PAR
ALLE
L
INPU
T
INPU
T
BY
PA
U
OU
TPUT
BR
BYPA
SS B
REAK
ER
WAR
NING
:
ONLY
AUT
HOR
IZED
SER
VICE
PER
SON
NEL
CAN
REM
OVE
THIS
COV
ER P
LATE
.
REM
OVIN
G TH
IS CO
VER
PLA
TE W
ILL C
AUS
E
THE I
NVER
TER
TO S
HUT
DOW
N. SE
E TH
E
USER
S MA
NUA
L FO
R IN
STRU
CTIO
NS.
TO U
PS-1
INPU
T
TO U
PS-1
OUT
PUT
TO U
PS P
ARAL
LEL
TO U
PS P
ARAL
LEL
UPS
MBP
Standoff × 8 (
6
)
6
4
Cable Gland × 4 (Optional)
Wire × 4 ( )
9
M3 Screw × 8 ( )
1
OUT
PUT
INPU
T
10.2.7. Start-up Operation
NRT3-OP-MBP
All the equipment and the UPS system must be properly connected and there
must be an acceptable AC voltage present. Please refer to the UPS User Manual
for more information.
Do not remove the cover plate of the Manual Bypass’ MANUAL BYPASS
SWITCH during operation.
1
Turn on the input utility breaker at the service panel.
2
Turn on the Manual Bypass’ UPS OUTPUT BREAKER.
3
Turn on the circuit breaker on each connected external battery pack.
4
Turn on the UPS’s INPUT BREAKER. After that, the fans will turn on and the
UPS will run in bypass mode.
If there is a power interruption while the UPS is in bypass mode, the
connected loads won’t be protected.
5
Turn on the connected loads.
6
Press and hold the UPS’s ON/ OFF button for 3 seconds and release it after
you hear one beep to turn the UPS on.
7
Please refer to the UPS User Manual for more information.