
NETYS RT 5 - 7 - 9 - 11 kVA - 551570A - SOCOMEC
89
EN
10.3.5. Installation Procedures
Rack Mounting
Please follow the rack mounting procedure in
10.1.3. Battery Installation Procedures
Tower Mounting
Please follow the tower mounting procedure in
10.1.3. Battery Installation Procedures
Please tighten the provided screws to install the grounding kit to connect to
UPS for grounding. See
Figure 10-25
.
(Figure 10-25)