![Snell & Wilcox Supervisor LX Operation & Installation Manual Download Page 20](http://html1.mh-extra.com/html/snell-and-wilcox/supervisor-lx/supervisor-lx_operation-and-installation-manual_1309048020.webp)
SuperVisor LX
SECTION 4
FGAX3249400MANAA
100701
Version 1 Issue 2
4.1
Operation
IMPORTANT-
POWERING-UP
When the ShoeBox controller is powered up it will
attempt to connect to a mainframe unit. The
following message will be seen:
When a connection to a mainframe unit has been
established the following message is displayed as
the ShoeBox controller initializes itself.
If the physical connection to the mainframe is lost
then the ShoeBox controller will attempt to
re-establish a connection. This process should be
fully automatic.
Note that there may be rare occasions when the
ShoeBox controller does not complete the
initializing process. Should this happen the Home
button should be pressed. This will force the
ShoeBox controller to re-initialize.
Note that the same effect as a power cycle for the
Shoebox can be achieved by simultaneously
pressing the buttons marked 4 and Tint on the
Shoebox front panel and selecting
Yes
in the
display screen
Searching for unit:
0000 : 40 : 05
Please wait...
R e s t a r t
P a n e l !
A r e
y o u
s u r e ?
◀
◀
◀
◀
Y e s
N o
▶
05 : IQD1MMB