- 15 -
4. Preparation for Operation
4.1 Charging of the battery
The battery built into the controller is fully charged by energizing continuously.
The battery charging time will depend on the specifications of the battery used by the customer.
STS2 lights up green when 48 hours continuous charging is completed.
Caution
When the power supply is cut for longer than 1 hour after fully charging the battery, and is applied
again, STS2 lights up orange.
4.2 Setting the power supply period by switch setting
The power supply (backup) period is set by the combination of SW (switches).
To operate the actuator manually during back-up, make sure that the cycles of the motor is within the
range of "Maximum cycle of the motor when the power supply is cut" If the motor rotation limit is
exceeded, or the backup period is exceeded, the information of the encoder position will be lost/
corrupted. In this case, an alarm is generated.
Backup period guideline
SW1
SW2
SW3
Maximum cycle of the motor when
the power supply is cut
Long
OFF
OFF
OFF
100rpm or less
ON
OFF
OFF
200rpm or less
OFF
ON
OFF
400rpm or less
Short
ON
ON
OFF
800rpm or less
* Pushing SW to the side with numbers switches it ON.
* The SW settings go into effect when the power is shutoff.
* SW4 is not used.
Caution
"Maximum cycle of the motor when the power supply is cut" does not limit the step data speed when
the power is supplied.
1
2
3
ON
SW3
SW2
SW1