6.7 Lubrication line connection
CAUTION
Risk of falling
Exercise care when dealing with lu-
bricants. Bind and remove spilled or
leaked lubricants immediately.
Connect lubrication lines in such
way that no forces are trans-
ferred to the product (tension-
free connection).
All components of the centralized lubrication
system must be laid out for:
○
the maximum arising operating pressure
○
the admissible ambient temperature
○
the output volume and the lubricant to be
supplied
○
The lubricant flow should not be impeded
by the installation of sharp elbows, angle
valves, gaskets protruding to the inside,
or cross-section changes (big to small).
Provide unavoidable changes of the cross
sections in the lubrication lines with as
smooth transitions as possible
Observe the following installation instruc-
tions for safe and smooth operation.
○
Use clean components and filled lubrica-
tion lines only
○
The main lubrication line should be laid
preferably rising with a possibility to vent
it at its highest point. Lubrication lines
shall generally be laid in such way that
there can never be created air pockets at
any point
○
Possibly mount the lubricant metering
devices at the end of the main lubrication
line in such way that the outlets of the lu-
bricant metering devices show upwards
○
If lubricant metering devices have to be
mounted below the main lubrication line,
then this should not be done at the end of
the main lubrication line
Summary of Contents for LINCOLN P203
Page 84: ...EN 16 Annex 84 951 171 021 Version 02 16 China RoHS Table...
Page 85: ...Notes...
Page 86: ...Notes...
Page 87: ...Notes...