
EN
10. Maintenance
- 86 -
951-180-076-EN
Version 0y
Mointenonce checklist
Activity to be performed on the unit
YES
NO
Electrical connection established correctly
Cable glands and lines are properly connected (not loose).
Mechanical connection established correctly
The performance data for the aforementioned connections matches the specifications in “Technical data”
All components such as lubrication lines and feeders are correctly mounted
No apparent damage, contamination, or corrosion
Any dismantled protective and monitoring equipment is fully reinstalled and functional
All warning labels on the product are present and in proper condition
No unusual noises, vibrations, moisture accumulation, odors present
No undesired discharge of lubricant at connections
Lubricant is fed without bubbles
The bearings and friction points requiring lubrication receive the planned amount of lubricant
Varnishing is fully present; no parts of the varnishing are missing
Protective earthing system fully present, properly connected, and electrically continuous
No accumulated dust present
10.2 Maintenance checklist for pump units