EN
7. Initial commissioning
- 82 -
951-180-076-EN
Version 0y
Checklist for covvissioning
7.4 Inspections before initial commissioning
YES
NO
Electrical connection established correctly
Mechanical connection established correctly
The performance data for the aforementioned connections matches the specifications in “Technical data”
All components such as lubrication lines and feeders are correctly mounted
Product is protected by a suitable pressure regulating valve.
No apparent damage, contamination, or corrosion
Any dismantled protective and monitoring equipment is fully reinstalled and functional
Grounding fully present, properly connected, and electrically continuous
Equipotential bonding fully present, properly connected, and electrically continuous
No accumulated dust present
No unusual noises, vibrations, moisture accumulation, odors present
No undesired discharge of lubricant at connections (leaks)
Lubricant is fed without bubbles
The bearings and friction points requiring lubrication receive the planned amount of lubricant
To ensure safety and functionality, the per-
son specified by the operator is required
to perform the following inspections. Any
detected deficiencies must be resolved im-
mediately. The correction of deficiencies
must be done exclusively by a specialist
competent and authorized to do so.