Hull unit
39
851-164574 / C
4.6 Mechanical support
To ensure the safety of the sonar system and the vessel, it is very
important that the mechanical support of the hull unit gantry is
satisfactory.
To prevent unwanted vortex induced vibration, the Hull Unit must
be secured to the bulkhead. Use the two pre-drilled holes on the
gantry to mount support brackets in the fore-and-aft and sideways
direction. It must be possible to remove the support brackets if
maintenance is required.