Start-up procedures
87
851-164574 / C
9 START-UP PROCEDURES
9.1 Introduction
The procedures in this chapter shall be carried out once all the
hardware units have been installed, and the cabling is finished.
When you perform the procedures, make sure that you only
perform those tasks described, and in the given order. Also, check
off every item in the procedure as you carry on.
The following procedures shall be performed:
→
Checklist before start-up commences, page 88.
→
Staring the stand-by power supply, page 89.
→
Staring up the Hull Unit, page 91.
→
Starting the wheelhouse units, page 97.
→
Checking the Operator Panel, page 99.
→
Checking the hoisting and lowering system, page 104.
→
Starting up the Transceiver Unit, page 110.
→
Self-noise test, page 112.
→
System start-up, page 113.
→
Alignment of the sonar picture, page 118.
→
Alignment of the stabilization offset, page 120.
→
Defining own ship parameters, page 122.
Summary of Contents for SP60 - REV D
Page 2: ......
Page 14: ...Simrad SP60 X 851 164574 C Notes...
Page 61: ...Transceiver unit 45 851 164574 C Figure 13 Mounting the Transceiver Unit CD3110A...
Page 214: ...Notes...
Page 215: ...Notes...
Page 217: ......