It is a requirement of AS1851 - Part 8, Maintenance of Fire Protection Equipment, that tests be
carried out to ensure the system is fully functional.
The owner or tenant of the premises usually carries out the weekly test described. The
maintenance company, under a Service Agreement, typically carries out the monthly and annual
tests.
Refer to the page number listed in this table for information on a specific topic.
Topic
See Page #
Weekly Tests
12-2
Monthly Tests
12-3
Annual Tests
12-4
WARNING
It is very important that adequate precautions are taken when doing any testing on the fire alarm
system. Outputs of a typical panel include calling the Brigade, activating the building evacuation
system, shutting down air conditioning, and may include release of extinguishant within the
building.
Brigade signalling must only be tested with prior arrangement and use of the “test key” or other
protocol as is applicable to the area.
Chapter 12
Maintenance Procedures
Introduction
In this Chapter
Summary of Contents for 4100U-S1
Page 2: ......
Page 10: ...viii...
Page 18: ...1 8...
Page 36: ......
Page 46: ......
Page 52: ......
Page 64: ......
Page 78: ......
Page 82: ...11 4...