In addition to the weekly test specified previously, the following inspection and testing
procedures should be carried out each month:
a. Check all battery terminals and electrolyte levels, where appropriate. Maintain all batteries
in a serviceable condition.
b. Check condition of battery enclosure for corrosion and ensure the batteries are stored in a
safe and secure condition.
c. Check that all visual indicators operate correctly, including those on mimic or repeater
panels.
d. Check the operation of all aural and visual indicators external to the control and indicating
equipment.
e. Simulate fault conditions on all alarm zones to ensure that fault indicators, both aural and
visual where applicable, are operating correctly from each alarm zone facility.
f.
Check that all control and indicating equipment is in a clean and operational condition, and
effectively dust-sealed.
g. Ensure that all fire indicator panels, sub-indicator panels, repeater panels, and mimic panels,
are clearly visible and readily accessible (see AS1670).
h. Ensure that all controls are returned to the normal condition.
i.
Record the results of all monthly maintenance procedures in the logbook, including all items
requiring corrective action, adjustment, and the like.
j.
Check that items previously recorded as requiring attention have been attended to, or record
the reason why corrective actions have not been completed.
Monthly Tests
Procedure
Summary of Contents for 4100U-S1
Page 2: ......
Page 10: ...viii...
Page 18: ...1 8...
Page 36: ......
Page 46: ......
Page 52: ......
Page 64: ......
Page 78: ......
Page 82: ...11 4...