Signal name
Pin assignment = MBJ01DE001.CX-X22
Reserve
Reserve
3
Reserve
4
220 V DC battery voltage (this voltage can differ
depending on the particular country)
L+
5
L-
6
Table 3-5
Connector assignment for voltages greater than 60 V (3 AC)
Signal name
Pin assignment = MBJ01DE001.CX-X40
400 V AC 50 Hz supply voltage (this voltage can
differ depending on the particular country)
L1
1
L2
2
L3
3
The DRIVE-CLiQ connection is not integrated in the connectors mentioned above. The DRIVE-
CLiQ connection is directly wired.
3.5.45
Optical link module (option G74)
The transition from PROFIBUS to a fiber-optic cable is implemented using the Optical Link
Module (OLM).
3.5.46
Diagnostics module PADU8-M (option G76)
In addition to the standard PROFIBUS connection for process control, this diagnostics module
also allows the exchange of signals via digital and analog inputs and outputs. The signals are
transmitted as isolated signals.
3.5.47
Temperature evaluation of the MV transformer (option K63)
An additional evaluation unit measures the temperatures at specific points in the starting
converter transformer using PT100 resistance thermometers. Normally, the three windings and
the middle leg of the transformer are monitored. A pre-alarm and a limit temperature are
monitored as digital signals.
3.5.48
Electronic power supply with 24 V DC infeed (option K73)
The infeed for the electronic components can be 24 V DC +/- 15 %.
3.5.49
Electronic power supply with 1 AC 230 V infeed (option K74)
The infeed for the electronic current opponents can be 1AC 100-120 V / 220-240 V (-15 % +10 %).
Description
3.5 Options
3rd Party LCI Control Upgrade
Operating Instructions, 02/2022, A5E31872818
53