9. Fasten the four eyebolts
⑫
on the phase module. Position the stacker so that you can hang
the eyelets on the fork.
10.Lift up the phase module and put it to one side.
11.Now lift the new phase module in the same manner from the transport packaging. Place the
phase module on the changing device.
See also
Attaching the changing device to the stacker (Page 196)
Installing a phase module
Installing the module
1. Install the intact module in the reverse order of the previously described steps.
2. When tightening the screws, make sure that you use the appropriate torque (Page 193)
permissible for each screw type.
3. Tighten the joints between the water pipes by hand.
Performing final checks
1. Open the valves.
2. Make sure that the connections are tight.
3. Make sure that the flow is ensured once the re-cooling unit has been switched in.
Maintenance
9.5 Repair
SINAMICS GM150 6SL3835-2LN44-2AA0
204
Operating Instructions Rev.201910281250 MUSTER
Summary of Contents for Sinamics GM150 6SL3835-2LN44-2AA0
Page 2: ...28 10 2019 12 50 V32 00 ...
Page 232: ...Index SINAMICS GM150 6SL3835 2LN44 2AA0 232 Operating Instructions Rev 201910281250 MUSTER ...
Page 233: ......
Page 236: ......
Page 238: ......