SD39EAM-1r4
Circuit Description
September 2005
4-3
Power is normally supplied to each isolated channel via an isolation power transformer driven by a power
chopper DC-to-DC converter circuit. The transformer secondary’s voltage waveform is AC coupled into
the ASIC’s clock input in addition to being rectified for isolated 24 Vdc ASIC and I/O power. The 24
Vdc I/O field power is switched through an opto-coupler and applied through a diode to the PWR
terminal on a local or remote termination assembly. Additionally, the 24 Vdc is connected by a diode to
the O-Sense pin of the ASIC. This pin is used for diagnosing the condition of the 24 Vdc supply and
detecting the state of the external opto-coupler.
The ASIC features the following:
•
An ADC (Analog-to-Digital Converter) for input signals of 0-5V or 0-20mA
•
A DAC (Digital-to-Analog Converter) for an output signal of 0-20 mA
•
Reads voltage or current frequency inputs at frequencies up to 46080 Hz
•
Contains built-in diagnostics
•
Designed for bi-directional Manchester encoded serial data over a communications transformer for
ease of isolation
•
Uses HDLC (Hi-Level Data Link Control) protocol
•
Synchronous internal digital circuits are clocked by an external clock derived from the power
transformer secondary
Each EAM channel can be separately configured via APACS
4-mation
configuration software to be one
of the following channel types:
•
Analog input (4-20mA, 0-20mA, 1-5V, or 0-5V)
•
Analog output (4-20mA or 0-20mA)
•
Frequency input (0-46 kHz)
•
Totalizer
input
•
Discrete input (sinking or sourcing)
•
Discrete output (sourcing)
An EAM configuration is downloaded into the module’s memory and a copy of the configuration is
stored in the associated control module’s non-volatile memory.
Summary of Contents for APACS+
Page 16: ......
Page 26: ...Installation SD39EAM 1r4 2 10 September 2005 Figure 2 3 EAM Marshalled Termination Assembly ...
Page 27: ...SD39EAM 1r4 Installation September 2005 2 11 Figure 2 4 Marshalling Termination Panel ...
Page 40: ...Installation SD39EAM 1r4 2 24 September 2005 Figure 2 9 Sample Input and Output Connections ...
Page 41: ...SD39EAM 1r4 Installation September 2005 2 25 Figure 2 10 I O Cable End Preparation ...
Page 42: ......
Page 47: ...SD39EAM 1r4 Maintenance September 2005 3 5 Figure 3 1 Cover Plate Securing Screws ...
Page 48: ...Maintenance SD39EAM 1r4 3 6 September 2005 Figure 3 2 User Replaceable Fuse ...