SD39EAM-1r4
Contents
September 2005
i
Table of Contents
Section
Title
Page
1 Introduction....................................................................................................................1-1
1.1 Product
Description ......................................................................................................1-1
1.2 Product
1.3 Related
2 Installation......................................................................................................................2-1
2.1
Preliminary Considerations and Preparation ................................................................2-1
2.2 Hardware
Identification ................................................................................................2-3
2.2.1
Enhanced Analog Module (EAM) Identification...................................................2-3
2.2.2
EAM Termination Strip and EAM Marshalled Termination Assembly ................2-3
2.3 Environmental
Considerations .....................................................................................2-4
2.4
Equipment Delivery and Handling ...............................................................................2-4
2.4.1 Predelivery Test .....................................................................................................2-5
2.4.2 Factory
2.4.3
Receipt of Shipment...............................................................................................2-5
2.4.4
Return of Equipment within North America..........................................................2-5
2.4.5
Return of Equipment outside North America ........................................................2-6
2.4.6 Equipment
Handling ..............................................................................................2-6
2.4.7 Equipment
Storage .................................................................................................2-6
2.5
EAM Termination Strip Installation .............................................................................2-6
2.6
EAM Marshalled Termination Assembly and I/O Cable Installation ..........................2-9
2.6.1
Marshalled Termination Assembly Installation to DIN Rail .................................2-9
2.6.2
Optional (Flat Surface) Marshalled Termination Assembly Installation .............2-12
2.6.3 Cable
Installation .................................................................................................2-14
2.7 EAM
Installation ........................................................................................................2-17
2.7.1
MODULRAC Mechanical Keying ......................................................................2-17
2.7.2 Module
Installation ..............................................................................................2-19
2.8 Electrical
Installation ..................................................................................................2-19
2.8.1
I/O Cable Connections .........................................................................................2-20
2.8.2
Unterminated I/O Cable .......................................................................................2-20
2.9
APACS Calibration Verification Requirements - Long Term Drift...........................2-20
3 Maintenance ...................................................................................................................3-1
3.1
Tool and Equipment Requirements ..............................................................................3-1
3.2 Visual
3.3 Cleaning........................................................................................................................3-2
3.4 Troubleshooting............................................................................................................3-3
3.4.1
Main Fuse Replacement.........................................................................................3-4
3.5 EAM
Removal/Replacement ........................................................................................3-7
3.6
EAM Termination Strip Removal/Replacement ..........................................................3-8
3.6.1 Removal
Procedure ................................................................................................3-8
3.6.2 Replacement
Procedure..........................................................................................3-8
3.7
EAM Marshalled Termination Assembly Removal/Replacement ...............................3-8
3.7.1 Removal
Procedure ................................................................................................3-8
Summary of Contents for APACS+
Page 16: ......
Page 26: ...Installation SD39EAM 1r4 2 10 September 2005 Figure 2 3 EAM Marshalled Termination Assembly ...
Page 27: ...SD39EAM 1r4 Installation September 2005 2 11 Figure 2 4 Marshalling Termination Panel ...
Page 40: ...Installation SD39EAM 1r4 2 24 September 2005 Figure 2 9 Sample Input and Output Connections ...
Page 41: ...SD39EAM 1r4 Installation September 2005 2 25 Figure 2 10 I O Cable End Preparation ...
Page 42: ......
Page 47: ...SD39EAM 1r4 Maintenance September 2005 3 5 Figure 3 1 Cover Plate Securing Screws ...
Page 48: ...Maintenance SD39EAM 1r4 3 6 September 2005 Figure 3 2 User Replaceable Fuse ...