![Siemens 7SR18 Solkor Manual Download Page 73](http://html.mh-extra.com/html/siemens/7sr18-solkor/7sr18-solkor_manual_383100073.webp)
7SR18 Description Of Operation
Unrestricted Page 70 of 78
©2018 Siemens Protection Devices Limited
Section 6: Other Features
6.1
Data Communications
Two communication ports are provided designated COM1 and COM2. COM1 is a RS485 connection available on
the terminal blocks at the rear of the relay. COM2 is a USB port provided at the front of the relay for local access
using a PC.
Optionally, additional IEC61850 communication ports are available: -
2x Electrical Ethernet with RJ45 connectors IEC 61850 - (COM 3),
2x Optical Ethernet with Duplex LC 100BaseF connectors IEC 61850 - (COM 3)
The COM1 port can be selected to operate as a local or a remote port operation.
Communication is compatible with Modbus-RTU, IEC60870-5-103 FT 1.2 and DNP 3.0 transmission and
application standards.
For communication with the relay via a personal computer (PC) a user-friendly software package, Reydisp
Evolution or Reydisp Manager, is available to allow transfer of relay settings, waveform records, event records,
fault data records, Instruments / meters and control functions. Reydisp is compatible with IEC60870-5-103.
6.2
IEC 61850 Communications
The relay can optionally be provided with IEC61850 comms.
IEC61850 is provided with an added EN100 communication module.
The following EN100 output alarms are provided:
EN100 Life:
When the relay is powered up, the EN100 Module initializes with the relay.
When initialization is successful this point becomes true.
EN100 Error:
During relay operation, if an error occurs with the data communication
between the EN100 module and the relay, this point becomes true. - This
does not specify if there is an error with one of the communication channels
(Link 1/2)
IEC61850 Configured:
This point will become true when an IEC 61850 station/network has been
configured and the all 61850 associated data has been synchronized to the
relay
EN100 Ch1 Link Down:
When communication is lost on the Channel 1 Ethernet port this point
becomes true.
EN100 CH2 Link Down:
When communication is lost on the Channel 2 Ethernet port this point
becomes true.
For further details refer to the following publications:
Model Implementation Conformance Statement (MICS)
Protocol Implementation Conformance Statement (PICS)
Protocol Implementation Extra Information for Testing (PIXIT)
Summary of Contents for 7SR18 Solkor
Page 1: ...Energy Management 7SR18 Solkor Line Differential Relay Reyrolle Protection Devices ...
Page 2: ...Siemens Protection Devices Limited 2 ...
Page 93: ...7SR18 Configuration Guide Unrestricted Page 12 of 12 2015 Siemens Protection Devices Limited ...
Page 221: ...7SR181 Solkor Technical Manual Chapter 4 Page 2 of 80 2016 Siemens Protection Devices Limited ...
Page 225: ...7SR181 Solkor Technical Manual Chapter 4 Page 6 of 80 2016 Siemens Protection Devices Limited ...