![Siemens 7SR18 Solkor Manual Download Page 335](http://html.mh-extra.com/html/siemens/7sr18-solkor/7sr18-solkor_manual_383100335.webp)
7SR18 Commissioning & Maintenance Guide
Unrestricted Page 36 of 54
©2018 Siemens Protection Devices Limited
3.6.4
ANSI R
ESET
If the element is configured as an ANSI characteristic, it may have a reset delay applied. If ANSI reset is selected
for an IEC characteristic element, the reset will be instantaneous.
ANSI reset times from operated condition to fully reset are as follows for zero applied current and TM = 1.0. The
reset curve characteristic type and TM is defined by the operating characteristic.
Curve
Fully operated to reset with Zero current applied & TM=1 (seconds)
ANSI-MI
4.85
ANSI-VI
21.6
ANSI-EI
29.1
Apply current in the following sequence, a) 2x setting for a time to ensure element operation, b) Zero current for
the reset time above (xTM), c) 2x setting for a time to ensure element operation. Check that the second operation
(c) is similar to the first (a) and in line with the expected operate time for the element at this current level.
Repeat the test with the reset time (b) reduced to 50 % of the previous value. Ensure that the second operate
time (c) is 50 % of the first (a) operate time.
Check correct indication, trip output, alarm contacts, waveform record.
3.6.5
IEC R
ESET
If the element is configured as an IEC characteristic, it may have an IEC (decaying) reset delay applied. If IEC
reset is selected for an IEC characteristic element, the reset will be instantaneous.
IEC reset times from operated condition to fully reset are as follows for zero applied current and Time multiplier
(TM) = 1.0. The reset curve characteristic type and TM is defined by the operating characteristic.
Curve
Fully operated to reset with Zero current applied & TM=1 (seconds)
IEC-NI
9.7
IEC-VI
43.2
IEC-EI
58.2
IEC-LTI
80
Apply current in the following sequence, a) 2x setting for a time to ensure element operation, b) Zero current for
the reset time above (xTM), c) 2x setting for a time to ensure element operation. Check that the second operation
(c) is similar to the first (a) and in line with the expected operate time for the element at this current level.
Repeat the test with the reset time (b) reduced to 50 % of the previous value. Ensure that the second operate
time (c) is 50 % of the first (a) operate time.
Operate
time
(expected)
Reset time
(calculated)
Operate time
(measured)
50 % Reset
Time
(calculated)
50 % operate
time
(calculated)
50 % operate time
(measured)
First test (c)
Second Test (c)
Operate
time
(expected)
Reset time
(calculated)
Operate time
(measured)
50 % Reset
Time
(calculated)
50 % Operate
time
(calculated)
50 % Operate time
(measured)
First test (c)
Second Test (c)
Summary of Contents for 7SR18 Solkor
Page 1: ...Energy Management 7SR18 Solkor Line Differential Relay Reyrolle Protection Devices ...
Page 2: ...Siemens Protection Devices Limited 2 ...
Page 93: ...7SR18 Configuration Guide Unrestricted Page 12 of 12 2015 Siemens Protection Devices Limited ...
Page 221: ...7SR181 Solkor Technical Manual Chapter 4 Page 2 of 80 2016 Siemens Protection Devices Limited ...
Page 225: ...7SR181 Solkor Technical Manual Chapter 4 Page 6 of 80 2016 Siemens Protection Devices Limited ...