Operate the shutoff valves in the following order. Refer to Figure 5-3 to identify the valves used in the
procedure.
1.
Close all valves.
2.
Open shutoff valve 2B.
3.
Apply to the transmitter, through the test connection shutoff fitting (2), a pressure corresponding to
zero.
4.
Check zero and correct if necessary.
5.
Close shutoff valve 2B.
6.
Open shutoff valve (4) on the pressure tap.
7.
Open process shutoff valve 2A.
1 Transmitter
2 Shutoff fitting
A - Shutoff valve to the process
B - Shutoff valve for test connection or venting
screw
3 Pressure pipe
4 Shutoff valve
5 Drain valve
6 Condensation vessel (for vapor only)
FIGURE 5-3 Measuring Vapor and Liquid
Summary of Contents for 7MF4033 series
Page 48: ...Model 275 Universal Hart Communicator UMSITRPDS3 1 November 2010 2 26 ...
Page 86: ...Installation UMSITRPDS3 1 November 2010 4 34 ...
Page 152: ...Calibration and Maintenance UMSITRPSD3 1 November 2010 7 20 ...
Page 158: ...Circuit Description UMSITRPDS3 1 November 2010 8 6 ...
Page 197: ......
Page 198: ......
Page 200: ...Model Designations and Specifications UMSITRPDS3 1 November 2010 9 42 ...
Page 204: ...Glossary UMSITRPDS3 1 November 2010 10 4 ...
Page 208: ...Appendix A Online Configuration Map UMSITRPDS3 1 11 4 November 2010 ...
Page 216: ...Appendix C Elevation and Suppression Correction UMSITRPDS3 1 13 4 November 2010 ...