Page 72 of 106
TMS 5001
Once the lift adjustment process is over, adjust the lead in conveyor rollers. Use the preforms of the new
format or a gauge with the measure for the format intended.
1. Loosen the bolts marked in the picture, two on each end, and open or close the rollers DEPENDING
on the format intended.
2. Place the two preforms on each end and adjust the position of the rollers so that the body of the preform
passes through the two rollers and so that the preform wing prevents it from falling. Depending on the
dimensions of the preform wing, leave more or less space between the roller and the preform (“X”
measure).
3. Once the rollers have been adjusted, tighten the bolts marked in the picture. Repeat these steps for
each pair of rollers.
x
Summary of Contents for TMS 5001
Page 1: ...TMS 5001 INSTRUCTIONS MANUAL OPERATION MANUAL ...
Page 18: ...Page 17 of 106 TMS 5001 MACHINE ...
Page 19: ...Page 18 of 106 TMS 5001 TOOL FOR MOULD COLOCATION Block mould ...
Page 21: ...Page 20 of 106 TMS 5001 1 A B ...
Page 23: ...Page 22 of 106 TMS 5001 2 3 UP UP DOWN and LEVEL DOWN and CONTACT DOWN and CONTACT ...
Page 106: ...Page 105 of 106 TMS 5001 H 10 30 ...
Page 107: ...Page 106 of 106 TMS 5001 if A B then A B A B A B ...