6.3
Manoeuvres
6.3.1
VOLTAGE CONNECTION
1. Connecting the blow moulding machine to the mains.
2. Place the master switch in position “1”.
6.3.2
COMMISSIONING
For commissioning, we must first press the
"OK" button
on the keypad until it lights. Then we press the
"Reset"
button
until the pilot light turns off. At this point, the blower is in service and ready to work. Once these
two operations have been completed, the machine is ready to work in manual or automatic mode according to
the position of the
"Manual
/ Automatic"
selector
on the keypad.
6.3.3
OPERATE IN AUTOMATIC MODE
With the "Manual/Automatic" switch in the automatic position, we press the preform holder carrier start-up
button. Then we press the lamp ignition button and finally the preform load button. After these three operations,
the blower is operational and waiting for the oven to reach the optimum working temperature to begin loading
preforms.
Summary of Contents for TMS 5001
Page 1: ...TMS 5001 INSTRUCTIONS MANUAL OPERATION MANUAL ...
Page 18: ...Page 17 of 106 TMS 5001 MACHINE ...
Page 19: ...Page 18 of 106 TMS 5001 TOOL FOR MOULD COLOCATION Block mould ...
Page 21: ...Page 20 of 106 TMS 5001 1 A B ...
Page 23: ...Page 22 of 106 TMS 5001 2 3 UP UP DOWN and LEVEL DOWN and CONTACT DOWN and CONTACT ...
Page 106: ...Page 105 of 106 TMS 5001 H 10 30 ...
Page 107: ...Page 106 of 106 TMS 5001 if A B then A B A B A B ...