Page 68 of 106
TMS 5001
7.
FORMAT CHANGE
7.1
PREVIOUS PROCEDURES
Following the order in the picture, it is necessary to have: A set of nozzle couplings, a set of Allen keys, a set
of spanners.
7.2
FORMAT CHANGE START-UP
1. Before starting to change the format, make sure that you close the water inlet valve, in the first place, and
then the water outlet valve.
2. Follow the order explained in this manual in order to carry out the different tasks so as to prevent ruptures
due to the interference between parts of different formats during the format change process.
Summary of Contents for TMS 5001
Page 1: ...TMS 5001 INSTRUCTIONS MANUAL OPERATION MANUAL ...
Page 18: ...Page 17 of 106 TMS 5001 MACHINE ...
Page 19: ...Page 18 of 106 TMS 5001 TOOL FOR MOULD COLOCATION Block mould ...
Page 21: ...Page 20 of 106 TMS 5001 1 A B ...
Page 23: ...Page 22 of 106 TMS 5001 2 3 UP UP DOWN and LEVEL DOWN and CONTACT DOWN and CONTACT ...
Page 106: ...Page 105 of 106 TMS 5001 H 10 30 ...
Page 107: ...Page 106 of 106 TMS 5001 if A B then A B A B A B ...