19
8011703/XF49/V3-1/2019-09| SICK
O P E R A T I N G I N S T R U C T I O N S | VICOTEC320
Subject to change without notice
INSTALLATION
5
5
Installation
5.1
Tools required
Apart from standard tools (such as drill, water level, tape measure), you also need the
following tools for the installation:
– 8 mm drill bit
– 15 mm drill bit
– Blowout pump for dowel holes
– 18 mm Allen key
– 19 mm Allen key
– Jaw wrench, 22 mm
– Torque wrench
– Rubber or plastic hammer
– Two laser adjustment units (
)
5.2
Material required
– 2 stainless steel assembly consoles incl. fixing accessories
– Connection lines (
see “Connection lines”, page 26
5.3
Preparing the installation location
Preparatory actions
▸
Secure the place of work
▸
Provide adequate lighting and power
▸
Provide a jack lift or stable ladder with clearance to wall
5.4
Transport
5.5
Scope of delivery
Included in scope of delivery:
●
Sender/receiver unit (incl. screws for fastening on assembly console)
●
Reflector (incl. screws for fastening on assembly console)
●
Connection unit (incl. dowels and screws for wall fitting)
●
Connection lines from the connection unit to the sender/receiver unit and to the
reflector
●
Protective covers
CAUTION: Accident risk through inadequate fastening of the device
▸
Consider the weight of the device when selecting fastenings.
▸
Check the load capability/state of the wall/rack on which the device is to be fitted.
Only use the packing provided by SICK to transport sensors. Warranty claims are void
when this is not observed.
The packing can be obtained from SICK free of charge when required.
Keep protective covers. Use protective covers when the equipment is put out of
operation for a short time (e.g. during tunnel cleaning).