2.2.2
Mounting accessories
Sender/receiver units are fitted to the pipeline using the following material:
Fig. 23
Mounting accessories (according to ANSI CL150; example with nozzle 2" Long Welding Neck"
)
Blind ( Blind flange
flange not shown)
Ball valve (only for retractable sender/receiver unit)
Seal
Marking
Connection
ANSI CL150 2" or 3”
Path
angle
90 °
View A
for path angle 75 °
75 °
Connection Bevel for
piece welding
VL L (Pipeline)
A
NOTICE:
Use of mounting accessories for standard temperature range -70...+180 C:
●
The ball valve must not be insulated for media temperatures below -40 °C
or higher than +160°C.
●
For gas temperatures below -40 °C or higher than +180°C, the tempera-
ture at the nozzle flange must be checked after through-heating during ini-
tial start-up. If required, the nozzle insulation must be removed as required
to stay in the specified temperature limit.
●
Do not exceed temperature and pressure ranges as listed in
. Material for use outside this specification is available as option
or on request.