
t
t
h
h
e
e
r
r
m
m
o
o
d
d
u
u
a
a
l
l
T
T
D
D
A
A
1
1
5
5
/
/
2
2
5
5
3
3
0
0
/
/
4
4
0
0
SHT Heiztechnik,
aus Salzburg
Operating instructions
M21/HB M27/GB
Page 65
SHT Heiztechnik aus Salzburg GmbH, A-5020 Salzburg-Bergheim, Rechtes Salzachufer 40 Tel. 0662-450444-0, Fax-DW 9
Our current general terms and conditions apply.Errors, printing faults and technical changes reserved
12.5
Annual servicing
Servicing of electrical and mechanical components on the device must be carried out annually.
We recommend that this servicing is carried out exclusively by SHT customer services or a qualified
specialised supplier.
Check the following mechanical parts in regular intervals:
Check tilting grate :
Caution! Only perform on an installation on which power has been disconnected,
danger of injury!
After removal of the small ash draw, the tilting grate can be be
pulled down by hand using a small lever.
Slag residue, nails and other foreign bodies must be removed.