
t
t
h
h
e
e
r
r
m
m
o
o
d
d
u
u
a
a
l
l
T
T
D
D
A
A
1
1
5
5
/
/
2
2
5
5
3
3
0
0
/
/
4
4
0
0
SHT Heiztechnik,
aus Salzburg
Operating instructions
M21/HB M27/GB
Page 31
SHT Heiztechnik aus Salzburg GmbH, A-5020 Salzburg-Bergheim, Rechtes Salzachufer 40 Tel. 0662-450444-0, Fax-DW 9
Our current general terms and conditions apply.Errors, printing faults and technical changes reserved
7.12
Menu item "Operation Hours"
Insertion:
Displays the overall operation hours of the pellet insertion screw in hours.
Pellet:
Displays overall pellets consumption in tons. This value is calculated according to insertion hours.
PelStarts:
Displays the overall number of pellets burner starts
Ignitions:
Displays how often the electric ignition was used for pellet ignition.
If the fuel is ignited by the residual heat at insertion, the electric ignition is not activated.
LogOperat.:
Displays for how many hours the boiler was in Log's operation.
System:
Displays for how many hours the system (boiler electronics) was on power.