Operating instructions
M21/HB M27/GB
Page 34
SHT Heiztechnik aus Salzburg GmbH, A-5020 Salzburg-Bergheim, Rechtes Salzachufer 40 Tel. 0662-450444-0, Fax-DW 9
Our current general terms and conditions apply.Errors, printing faults and technical changes reserved
•
2. Boiler Monitor
Lead boiler:
Boiler 1 Resttime xxh / Boiler 2 Resttime xxh:
Here, the duration of the actual boiler (1 or 2) being lead boiler is displayed.
Demanded / not demanded:
Displays if lead boiler is demanded (=if there is a heat demand) or not.
Supportboiler:
Boiler 1 Delay: 300s / Boiler 2 Delay: 300s
If the supportboiler is demanded, a delay time has to elapse before activating it – it is displayed here.
Demanded / not demanded:
Displays if support boiler is demanded (=if lead boiler cannot load the buffer alone) or not.
7.15
Menu item "Sprache / Language"
Here, the menu language can be selected; languages available at present: German (“Deutsch”),
English.