55(56)
6.6 Maintenance Schedule
6.6.1 About the Machine
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.6.2 Check After Installation
Check the gap between fixed blade and rotating blade. (0.4~0.5mm).
Check the rotating balance of the belt wheel.
Electrical Installation
Voltage: V Hz
Specs of the fuse: 1 Phase A 3 Phase A
Check phase sequence of the power supply.
Check the rotating direction of the conveying blower.
6.6.3 Daily Check
Check main power switch.
Check emergency stop button.
Check start / stop button.
Check material check plate (strip) is perfect or not.
Check whether emergency stop and safety switch works normally.
Clean screen and feeding hooper.
Check whether start, stop and power switches are normal.
6.6.4 Weekly Check
Check all the electrical cables.
Check if there are loose connections of electrical components.
Check blade condition.
Check whether set screws in fixed and rotate blades are under looseness.
Check if there is abnormal noise, vibration and heat in reduction gear.
Check the cracking window
6.6.5 Monthly Check
Check the status of the belt.
Check the overload protection function of the motor.
Summary of Contents for SG-3650E
Page 1: ...SG 36E Standard Central Granulators Date Apr 2013 Version Ver A English...
Page 2: ......
Page 8: ...8 56...
Page 28: ...28 56 2 4 Wiring Diagram 2 4 1 Main Circuit Picture 2 13 Main Circuit...
Page 29: ...29 56 2 4 2 Control Circuit Picture 2 14 Control Circuit 1...
Page 30: ...30 56 Picture 2 15 Control Circuit 2...
Page 31: ...31 56 2 4 3 Electrical Components Layout Picture 2 16 Electrical Components Layout...