39(56)
Picture 3-3
:
Installation of Blade Rest and Bearing
3.4 Installation of Belt Pulley and Motor
1) Interpose the key to the key groove and then install the driven wheel.
Picture 3-4
:
Installation of Belt Pulley and Motor 1
2) Lay lockup ring in the hole of the driven wheel and make both positions of the
hole to match each other then screw the hexagon socket cap screw.
3) Adjust the balance of the driven wheel with dial gauge. Stick the dial gauge to
the driven wheel and rotate the driven wheel to see whether the value of the
in dicator drops within 0~0.1 mm.
Picture 3-5
:
Installation of Belt Pulley and Motor 2
4) After balance, screw tightly the 8 hexagon socket cap screws.
5) Install the driving wheel in the bearing of the motor and screw the 6 hexagon
socket cap screws with the specificity of 10mmx35.
6) Lay the motor on the fixing plate to adjust and screw tightly the 4 fixing
screws. Push forward to shorten the space between the driving wheel and the
driven wheel.
Summary of Contents for SG-3650E
Page 1: ...SG 36E Standard Central Granulators Date Apr 2013 Version Ver A English...
Page 2: ......
Page 8: ...8 56...
Page 28: ...28 56 2 4 Wiring Diagram 2 4 1 Main Circuit Picture 2 13 Main Circuit...
Page 29: ...29 56 2 4 2 Control Circuit Picture 2 14 Control Circuit 1...
Page 30: ...30 56 Picture 2 15 Control Circuit 2...
Page 31: ...31 56 2 4 3 Electrical Components Layout Picture 2 16 Electrical Components Layout...