38(56)
3.2 Installation Place
Make enough installation space to facilitate the repair and maintenance.
Check and make sure the installation ground is level, and there is
enough intensity when it is running.
Use spirit level to adjust the cutting chamber to the level position.
Picture 3-2
:
Installation Place
3.3 Installation of Blade Rest and Bearing
1) Heat the bearing and lay it to be entrapped into the blade rest. Use 120
degrees transfer oil to heat it up for 5 minutes.
2) Fix the low half part of bearing base into both right and left sides of
table-board, match the positions of the hole and lock them tightly.
3) Put the blade rest in the cutting chamber and make both ends of its bearing to
match with the grooves.
Note!
Add some lubricating oil in both bearing and bearing block. Aluminous
circlip should be laid between the left bearing and its bearing block.
4) Install the baffle ring and bearing cap. Then, lock it up with screws.
Summary of Contents for SG-3650E
Page 1: ...SG 36E Standard Central Granulators Date Apr 2013 Version Ver A English...
Page 2: ......
Page 8: ...8 56...
Page 28: ...28 56 2 4 Wiring Diagram 2 4 1 Main Circuit Picture 2 13 Main Circuit...
Page 29: ...29 56 2 4 2 Control Circuit Picture 2 14 Control Circuit 1...
Page 30: ...30 56 Picture 2 15 Control Circuit 2...
Page 31: ...31 56 2 4 3 Electrical Components Layout Picture 2 16 Electrical Components Layout...