6.7 Maintenance Schedule
6.7.1 General Machine Information
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.7.2 Installation & Inspection
Check if the air pipe are tightly connected.
Check if the material clearance door tightly closed.
Check if the air pipes are correctly connected.
Check if there are damages of the honeycle.
Inspection of Electric Components
Voltage V Hz
Fuse melt current
:
1 Phase A 3 Phases A
Check phase sequence of the power supply.
Check the rotating direction of regeneration blower.
Check the rotating direction of conveying blower.
Check Air Supply of Compressor
Compressed air pressure bar
Air flow L/nun
Check if the compressed air purified or not
6.7.3 Daily Checking