
Installation and Wiring
16
3.2.3. Installation of Control Panel on Cabinet Panel
The user may remove the control panel from the SB200 inverter series and install it on the
cabinet panel. The control panel and the inverter may be connected by an extension cord. The
user may choose from the following two installation methods:
Method 1: Direct Installation:
①
Drill holes and openings on the cabinet panel as per the following drawing:
②
Remove the control panel and then the two screws on the diagonal line of the panel. Then fix
the panel onto the cabinet panel with the complimentary M3×14 screws.
③
Insert the socket at one end of the extension cord into the control panel and fix it with the
complimentary fasteners. The other end of the cord should be plugged firmly into the
corresponding socket on the circuit board of the inverter. Take care to cover the inverter.
Method 2: Installation into the Mounting box:
①
Make an opening in the cabinet panel as per the following drawing.
②
Install the mounting box (optional) of the control panel onto the cabinet panel.
③
Install the control panel into the box.
2× 4
4
H ole drilling for installing the
control panel onto the cabinet
R ectangular hole
for the cord
The thickness of
the cabinet panel
is less than 3m m
Screw Hole
Tw o M 33×14
screw s are needed
The com plim entary T/SL-23
fastener is used to prevent the
plug of the extension cord from
com ing off the control panel
Summary of Contents for SB200 Series
Page 4: ......