− −
− −
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
− −
− −
①
The test will begin as soon as you enter this mode.
②
After the test is complete, press the TEST Button to return to the Network Setting screen.
I
f the test completes successfully the message
�
G
OO
D
�
will be displayed, and
�
BAD
�
will be
displayed if a problem occurred.
I
f connection is not permitted
�
N/A
�
will be displayed.
I
f a test is performed directly after changing settings the results may be incorrect. This test
should be performed after turning off and restarting the product.
Summary of Contents for Dinosaur King
Page 3: ......
Page 110: ...105 105 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 AC UNIT DKT 4100 D 1 2...
Page 118: ...113 113 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1...
Page 120: ...24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 24 114 23 WIRING DIAGRAM D 1 2...
Page 121: ...24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 115 23 WIRING DIAGRAM D 2 2...