24
5.4. Installation hints
•
If converting to LP, convert the ZC-fireplace prior to installation.
•
Install the logs last because they are fragile.
•
Fumes and smoke from the paint curing and oil burning off the steel may occur the firs time you start this
ZC-fireplace. This is normal. We recommend you open windows to vent the room.
5.5. ZC-fireplace clearances
•
Cover door to sidewall = 3”
•
Cover door to mantel = 21”
•
Zero clearance enclosure to unit front = 3 ½”
•
Zero clearance enclosure to unit back = 5”
•
Unit bottom to floor = 3/8”
•
Top of unit to zero clearance enclosure ceiling = 56”
Be sure to mount the six standoffs as shown below. This assures the correct clearances to top and sides.
Summary of Contents for 70 gas insert / ZC-fireplace
Page 20: ...20 4 4 Approved venting configurations for vertical terminations Left Damper Right damper...
Page 32: ...32 Left Damper Right damper...
Page 33: ...33 5 13 Approved venting configurations for vertical terminations...
Page 34: ...34 Left Damper Right damper...
Page 49: ...49...
Page 60: ...60 Use a 3 mm hexagon key and a 13 mm open end wrench...
Page 61: ...61 9 3 Wiring diagram for blower 120 Volt Diagram 4...
Page 64: ...64 11 Safety label...