Part 2: DECT Hardware Installation & Programming
27
Installing the Expansion Board and IWUs
The CCFP expansion board has to be mounted in the CCFP if more than eight RFPs
are needed. The expansion board handles up to eight RFPs besides the eight RFPs
the CCFP main board handles (maximum 16 RFPs).
The CCFP needs the FLASH software PCS3 or later edition to control the expansion
board. If the CCFP has an older software version it is necessary to upgrade the sys-
tem. Upgrade software is not included in expansion kit (PN 13816).
1. Disconnect the CCFP from its power supply.
2. Remove the top cover.
3. Remove the blind cover plates.
4. Mount the expansion board on the CCFP by inserting the two plastic pins (Figures
2.2 and 2.3).
5. Insert the IWUs starting at slot no. 0 (Figure 2.2).
5. Mount the expansion board internal cable in place of the blind covers (Figure 2.4).
Expansion Board Rear Panel
Figure 2.3 Mounting Expansion Board
Figure 2.4 Internal Cable
Summary of Contents for DECT 500
Page 1: ...SAMSUNG DECT 500 1500 Product Name Installation and Programming Product Name Manual ...
Page 15: ...Part 1 Site Survey and Overview of DECT Systems 10 Survey Map of the 2nd Floor ...
Page 16: ...Part 1 Site Survey and Overview of DECT Systems 11 Survey Map of the 3rd Floor ...
Page 46: ...41 Appendix 1 Deployment Flowchart ...
Page 48: ...Samsung Telecoms U K Limited Brookside Business Park Greengate Middleton Manchester M24 1GS ...