Part 1: Site Survey and Overview of DECT Systems
4
y
Take into account interference from adjacent cells when the DECT system is installed in a
multi-storey building (Hot Spot).
y
Take into account the following characteristics of radio waves.
- Body
effect:
The RSSI and Q values may differ depending on the location of the handset on the hu-
man body.
- Speed of moving handset:
The RSSI and Q values may fluctuate if a handset moves at speed.
- Line of sight:
Much more consideration is required when a Base Station is to be installed in a wide-
open area.
- Multi-storey
deployment:
Characteristics of cells in each storey may differ due to the structure and materials of the
building.
Information Required
y
Obtain a map of the site
.
y
Note the general construction materials used in walls and doors of the building(s), including
window coating and covering, if any. Also note any large metal objects such as equipment,
doors, and fluorescent lamp shades. In general, radio frequency (RF) signals are attenu-
ated to some degree when passing though materials. Some materials, such as metal, at-
tenuate RF signals to a higher degree. (
y
Define
the number of handset users and which are the high traffic areas, such as confer-
ence rooms, cafeterias and manufacturing departments.
y
Check which positions allow and prohibit Base Station installation.
y
Determine the required coverage areas, such as elevators, stairwells, toilets, outdoor areas
etc.
y
Establish the position of the DECT system and available cabling.
Tools Needed for Site Survey
y
DECT Demonstration and Installation Kit
y
Handsets (D-5000): 2
y
Base Station (RFP)
y
Sound source (CD player and headset)
y
Tape measure
y
Map of the building
Summary of Contents for DECT 500
Page 1: ...SAMSUNG DECT 500 1500 Product Name Installation and Programming Product Name Manual ...
Page 15: ...Part 1 Site Survey and Overview of DECT Systems 10 Survey Map of the 2nd Floor ...
Page 16: ...Part 1 Site Survey and Overview of DECT Systems 11 Survey Map of the 3rd Floor ...
Page 46: ...41 Appendix 1 Deployment Flowchart ...
Page 48: ...Samsung Telecoms U K Limited Brookside Business Park Greengate Middleton Manchester M24 1GS ...