1
Introduction
This guide describes the procedures required for installing the Samsung DECT 500
and 1500 systems with Base Stations, Repeaters and handsets. Before installing the
hardware, a careful site survey must be carried out to determine the exact require-
ments of the site and the optimum locations for installing equipment.
The site survey and installation phase starts by surveying the site with the Site Sur-
vey kit and marking your findings on a plan of the site; it ends when the system has
been running for one or two weeks.
The procedure for the site survey and installation phase is summarised below.
1. Site survey by an accredited DECT engineer.
2. Install the Base Stations (and Repeaters if required) for optimum coverage.
3. Evaluate the site survey. If necessary, install additional Base Stations / Re-
peaters, or move existing Base Stations / Repeaters.
4. Register handsets.
Part 1
describes the site survey and provides a detailed overview of the various
components of your DECT system, including how Base Stations and Repeaters
should be positioned to provide optimum performance.
Part 2
provides information on procedures to install and configure the hardware
components for each system (CCFP, Base Stations, handsets etc.) and how to install
Repeaters.
Installation and configuration of the DECT 1500 system requires the use of the sup-
plied administration program running on a PC connected to the system. This is op-
tional for a DECT 500 system.
Some Terminology
Throughout this guide, you will find the following terms used:
CCFP=Central Control Fixed Part (the system “central processing unit”)
RFP=Radio Fixed Parts (Base Stations)
WRFP=Wireless Radio Fixed Parts (Repeaters)
PP=Portable Parts (handsets)
Important: The DECT system is not intended to be a cordless PABX solution. It
is provided as an “add-on” to enhance the current range of Samsung PABXs.
Summary of Contents for DECT 500
Page 1: ...SAMSUNG DECT 500 1500 Product Name Installation and Programming Product Name Manual ...
Page 15: ...Part 1 Site Survey and Overview of DECT Systems 10 Survey Map of the 2nd Floor ...
Page 16: ...Part 1 Site Survey and Overview of DECT Systems 11 Survey Map of the 3rd Floor ...
Page 46: ...41 Appendix 1 Deployment Flowchart ...
Page 48: ...Samsung Telecoms U K Limited Brookside Business Park Greengate Middleton Manchester M24 1GS ...