Part 1: Site Survey and Overview of DECT Systems
6
Choose the Base Station positions required. This may need to be done in consultation with a
customer engineer. In choosing Base Station positions, the required cabling to the keyphone
system should be considered. Base Station positions must be defined such that later installa-
tion problems are minimised.
8. Having completed the above procedures, install the Base Stations in the positions marked
on the map.
Some example cell planning results are shown at the end of this chapter.
Checklist for Survey Data
Building Characteristics (for each building)
y
Building identification (refer to maps if available)
y
What building is used for
y
Dimensions (refer to maps if available)
y
Number of floors
y
Height of each floor
y
Partitioning per floor
y
Construction details
Radio Coverage
List areas where radio coverage is not necessary or which are to be excluded from
radio coverage. Also list areas where radio coverage is not feasible or requires spe-
cific Base Stations.
Keyphone System
Type and location of keyphone system (e.g. OfficeServ 500).
Reporting Site Survey Results
It is important to make a comprehensive survey report that records site survey results
and provides useful information for the engineer who is to actually install the equip-
ment. The following information should be included in the survey report. (See the
y
A description of the site, explaining which buildings and grounds are to be included in the
report. A description of the topography of outdoor areas may be useful.
y
A specification of the construction of the buildings and construction materials.
y
Customer requirements for:
- the number of handsets
- required
coverage
- performance requirements (traffic density, grade of service etc.)
y
The location and the type of the keyphone system (e.g.
i
DCS500, OfficeServ500).
Summary of Contents for DECT 500
Page 1: ...SAMSUNG DECT 500 1500 Product Name Installation and Programming Product Name Manual ...
Page 15: ...Part 1 Site Survey and Overview of DECT Systems 10 Survey Map of the 2nd Floor ...
Page 16: ...Part 1 Site Survey and Overview of DECT Systems 11 Survey Map of the 3rd Floor ...
Page 46: ...41 Appendix 1 Deployment Flowchart ...
Page 48: ...Samsung Telecoms U K Limited Brookside Business Park Greengate Middleton Manchester M24 1GS ...